Ports & Cargo Handling – Ongoing Projects
Infrastructure - Ongoing Projects
Ports & Cargo Handling – Ongoing Projects
Projects
Development of Greenfield Port at Astaranga, Puri District, Orissa
Total Cargo - 27.1 MTPA
Number of Berths - 9
Breakwater Lengths:
North Breakwater - 1.36 km
South Breakwater - 1.92 km
Vessel Size – 1,70,000 DWT
Approach Channel
Length - 30 km
Width - 225 m
Depth - 20.2 m
Semi Mechanized/ Mechanized cargo Handling
Client:
Navayuga Engineering Company Limited
Consultant:
Grafix Engineering Consultants Private Limited
Basis:
BOOST
Scope:
Preparation of detailed project report
Duration:
18 Months
Development of Port at Machilipatnam, Krishna District, Andhra Pradesh
Total Cargo - 260 MTPA Master Plan
Length of Berths - 12.5 km
Breakwater Lengths:
North Breakwater - 0.136 km
South Breakwater - 1.05 km
Vessel Size – 1,50,000 DWT
Approach Channel
Length - 30 km
Width - 225 m
Depth - 20.5 m
Semi Mechanized/ Mechanized cargo Handling
Client:
Navayuga Engineering Company Limited
Consultant:
Grafix Engineering Consultants Private Limited
Basis :
BOOT
Scope:
Preparation of supplementary DPR
Duration:
12 Months
Development of Port at Vadarevu, Prakasam District, Andhra pradesh
Total Cargo- 27.76 MTPA
Number of Berths - 8
Breakwater Lengths:
North Breakwater - 0.83 km
South Breakwater - 2.74 km
Vessel Size – 2,00,000 DWT
Approach Channel
Length - 34 km
Width - 225 m
Depth - 20.5 m
Semi Mechanized/ Mechanized cargo Handling
Client:
Navayuga Engineering Company Limited
Consultant:
Grafix Engineering Consultants Private Limited
Basis :
BOOT
Scope:
Preparation of addendum to DPR
Duration:
6 Months
Development of Port at Krishnapatnam, Nellore District, Andhra Pradesh
Total Cargo - 8 MTPA
Number of Berths - 4
Breakwater Lengths:
North Breakwater - 1.45 km
South Breakwater - 1.85 km
Client:
Navayuga Engineering Company Limited
Consultant:
Grafix Engineering Consultants Private Limited
Basis :
BOOT
Vessel Size – 2,00,000 DWT
Approach Channel
Length - 11 km
Width - 250 m
Depth - 20.2 m
Semi Mechanized/ Mechanized cargo Handling
Scope:
Consultancy services for Phase-II development
Duration:
48 Months
Development of Port at Krishnapatnam, Nellore District, Andhra Pradesh – Master Plan
Click here to see enlarged view
Infrastructure - Ongoing Projects
Construction of Raja Gopuram for Srikalahasteeswara Temple - Srikalahasthi in Andhra Pradesh
Total Height - 150 ft
Design of Foundation
Design of Floors
Design of Walls
Design of Stairs
Client:
Navayuga Engineering Company Limited
Owner:
Endowment, Govt. of AP.
Four laning of Banihal-Quazigund section of NH-1A from km 189.350 to km 204.600 including 9.0km tunnel
Total Length - 15.25 km
Long Tunnel – 8.4km*
Short Tunnel – 0.6km*
Major Bridges – 3
Minor Bridges – 6
ROB – 1
Client:
Navayuga Banihal Toll way Private Limited
Owner:
NHAI
Basis :
DBFOT - TOLL
Construction of Bridges across River Lohit at Alubarighat and connecting road between Chowkham-Digaru covering a length of 12.00km in Arunachal Pradesh under Arunachal Pradesh package of Roads and Highways
Total Length - 12.00 km
Detailed Design of Well foundation & Sub structure of Major Bridges
Major Bridges – 2 (2.1km Long)*
Minor Bridges – 4 (Repair & Rehabitilation)
Pipe Culverts – 18
Client:
Navayuga Engineering Company Limited
Owner:
DEP. OF ROADS & HIGHWAYS
Basis :
DBFOT - ANNUITY
Construction of Bridges across River Dibang system and connecting road between Bomjur-Meka of NH-52 covering a length of 18.95km in Arunachal Pradesh under Arunachal Pradesh package of Roads and Highways
Total Length - 18.95 km
Major Bridges – 5
Pipe Culverts – 12
Client:
Navayuga Engineering Company Limited
Owner:
DEP. OF ROADS & HIGHWAYS
Basis :
DBFOT - ANNUITY
Construction of 12.90m wide Bridge between Dhola and Sadia ghats along with two lane connecting roads from near about Dhola to Islampur tinali in Assam (aproximatley 25.8km) under Arunachal Pradesh package of Roads and Highways
Total Length - 25.80 km
Major Bridges – 5
Minor Bridges – 1
Pipe Culverts – 6
Client:
Navayuga Engineering Company Limited
Owner:
DEP. OF ROADS & HIGHWAYS
Basis :
DBFOT - ANNUITY
Development of Greenfield Bridge across River Ganga connecting NH-31 near Bakhtiyarpur bypass of NH-31 near village Karjan and Tajpur on NH-28 in the state of Bihar
Total Length - 45.39 km
Major Bridges - 2
Minor Bridges - 1
ROB’s – 2
Culverts - 43
Grade Separators – 2
Underpasses - 16
Client:
Navayuga Engineering Company Limited
Owner:
BSRDC
Basis :
DBFOT - TOLL
Koderma Thermal Power Station – Design of Peripheral Road
Total Length - 8.00 km
Flexible Pavement Design
Drainage Design
Client:
Navayuga Engineering Company Limited
Owner:
Damodar Valley Corporation
Consultancy Services for Construction of Specular Radar Reflecting Bed near Dundigal, Hyderabad
Total Length - 2.00 km
Box Culverts - 3
Rigid Pavement Design
Drainage Design
Client:
DRDO
Owner:
Ministry of Defense
Up gradation of Hyderabad to Bangalore of NH-7 from km 534.720 to km 556.840 in the state of Karnataka.
Total Length - 22.12km
Flyovers - 4
Minor Bridges - 3
ROB's - 1
Pipe Culverts - 17
Underpasses - 5
Client:
Navayuga Devanahalli Tollway Limited
Owner:
NHAI
Basis :
DBFOT - TOLL
Four laning of Kundapur-Suratkal section of NH-17 from km 283.300 to km 358.00, From km 375.300 to km 376.700 and from km 3.700 to km 17.200. (Total Length Approx.- 90 km)
Total Length - 90 km
Major Bridges - 11
Minor Bridges - 10
ROB's - 1
Pipe Culverts - 105
Flyovers - 2
Toll plazas - 3
Client:
Navayuga Udipi Tollway Limited
Owner:
NHAI
Basis :
DBFOT - TOLL